Medical Center of the A.I. Yevdokimov Moscow State University of Medicine and Dentistry (MSUMD)
(2nd start-up complex)
Moscow, Kuskovskaya Street, site 1A
Architects: A.Bokov, Yu.Telitsin, N.Seferiants, Z.Tsikolia, A.Dzerzhkovitch.
Engineers: O.Makarova, V.Zuyev, L.Kashleva
Chief technologist S.Kanavina
Realized in 2015.
The location of the 1st start-up complex structures has predetermined the site zoning: in the central part the main buildings of the 1st and 2nd start-up complexes are placed; in the north-western part there are the anatomico-pathological building and engineering facilities (workshops, warehouses, main distribution substation (board) and diesel power station); in the north a chamber of vacuum dust and debris removal with a block of biological and food wastes is situated along the border of the site; in the north-east there is an entrance-exit ramp attached to the underground parking lot, which is combined with distribution transformer substation; in the east the oxygen-gasification plant is placed at the border of the site with the necessary breaks in it. The main entrance-exit leading to the territory is designed from Kuskovskaya Street, where the checkpoint No. 1, is located. The two fire-fighting entrances are organized in the northern and western parts of the site.
The construction footprint of the main building of the 2nd start-up complex is dictated by the constraint of the territory and by the necessity to provide the fire passages and breaks, as well as by the insolation problems of the existing 5-storey residential buildings, which in its turn had determined the height of the facility.
The volume-spatial composition of the main building of the 2nd start-up complex consists of a rectangular 10-storyed volume 120 m long with an eastern wing cut off along the line retaining the insolation of the 5-storyed residential building. The main building has a width18 m and is provided with three risalits (in order to increase the light front). This building is parallel to the 5-storeyed clinical and diagnostic building (the 1st start-up complex).
Perpendicularly to the main volume, towards the south, there is a 6-storeyed trapezoidal volume 70 m long, which ends with an added 3-storeyed volume of the assembly hall for 460 seats.
Technical and economic data:
Total site area 2.8047 hectares
Building area 0.8449 hectares
Number of storeys 2-3-6-9-10
Total area of buildings and structures, 63 588 sq. m
including:
– underground area 15 293 sq. m
– overground area 48 295 sq. m
Construction volume 243 408 cub. m
including:
– underground volume 61 758 cub. m
– overground volume 181 650 cub. m